What is a temporary power pole?
A temporary power pole, sometimes called a temp pole or spider box pole, is a freestanding structure with a meter socket and breaker panel that lets a job site draw utility power before the building has permanent electrical service. Contractors in Gilbert use them constantly, since most construction loans and inspection schedules require power on site well before final wiring is done. The pole itself has to be grounded and rated for the load, and 200 amp service covers most single-site construction needs, from saws and compressors to office trailers. If you are running a mobile office trailer or a restroom trailer rental with electric fixtures, the pole is often the first thing that goes in. GFCI protection on construction circuits falls under OSHA 1926.404(b)(1)(ii), and any licensed electrician setting the pole should already be building to that standard. Gilbert Porta Pros does not pull electrical permits or wire the pole ourselves, but we coordinate delivery timing so the pole, the temporary fence rental, and your sanitation units land on site the same week.
How much does temporary power pole installation cost?
Installation cost depends on amperage, meter configuration, and how far the pole sits from the utility connection point, and those numbers vary enough by site that we will not quote a flat figure here. What we can tell you is how the rest of your site budget tends to shape up. A roll-off dumpster rental for construction debris, a standard porta potty rental for the crew, and temporary fence rental around the pole and panel are the pieces we handle directly.
| item | day | week | month |
|---|---|---|---|
| standard porta potty | $100-$350 | $130-$500 | $125-$325 |
| 10-20 yard dumpster | $51-$112 | $426-$778 | $500-$778 |
| chain link fence | $30-$75 | -- | -- |
Check current numbers on our dumpster rental cost and porta potty rental cost pages before you finalize a site budget. For the pole itself, get a written estimate from the electrician or utility coordinator, since that scope sits outside what we install.
Where does the temporary power pole go on my site?
Placement depends on your site diagram, and the utility company usually dictates the approach path and clearance from the transformer or overhead line. A rough temporary power pole diagram should show the pole location, the distance to the panel or trailer it feeds, and a clear path for the utility truck. If you are also bringing in a roll-off dumpster rental, remember that a delivery needs about 60 feet of straight clearance behind the truck, so plan pole placement away from that swing path. Same logic applies to storage container rental units and restroom trailer rental trailers: keep the approach lanes open. Housekeeping around the pole and panel matters too. OSHA 1926.25 requires scrap and debris cleared from work areas, and a loaded panel is not the place for lumber offcuts or trash. Gilbert sites with tight lots benefit from mapping out pole, fence, dumpster and toilet locations together before anything gets delivered, which is exactly what our porta potty placement guide walks through.
How long does a temporary power pole rental last?
Most stay up for the length of the construction project, from initial permit through final electrical inspection and permanent service hookup. Some contractors need it for a few months, others for a year or more on larger builds. Coordinate the removal timeline with your electrician once permanent power is approved and connected.
Do I need a permit for a temporary power pole?
Almost always, yes, since it involves an electrical connection to the utility grid. Requirements differ by jurisdiction and we are not the authority on Gilbert's electrical permitting, so confirm directly with the city and your utility provider before scheduling installation.
Can Gilbert Porta Pros install the power pole itself?
No. We coordinate delivery scheduling for dumpsters, fencing, and restroom units around your electrical timeline, but the pole, meter, and wiring need a licensed electrician. Ask us about bundling handwashing station rental and toilets around the same delivery window instead.
What amperage do most construction sites need?
200 amp service covers typical single-site construction loads, including saws, compressors, and a job trailer. Larger sites running multiple trailers or heavy equipment may need higher capacity. Your electrician can size the service to your actual equipment list.
How far in advance should I schedule the pole?
Utility companies often need lead time to schedule the connection, sometimes several weeks depending on workload. Book early, especially if your project also needs temporary fence rental or light tower rental coordinated around the same start date.

Next step
Get a delivery date
Tell us the address, the dates and the headcount. We size the order and confirm the route.